|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BUILDING |
|
|
|
|
|
|
|
|
|
|
|
Zagreb Dance Center
Reconstruction of old cinema Lika |
|
|
|
|
|
DESIGNER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DESCRIPTION |
|
|
|
|
|
|
|
|
|
|
The opening of big movieplex cinemas in Zagreb has led to the dying out of old cinema theatres in the city centre. The City of Zagreb, who is the owner of the old cinema Lika, decided to reuse the space for new cultural facilities. In that scenario old cinema Lika was given the role of a new dance centre.
Fifty years of contemporary dance culture in Zagreb has produced about 40 dance troops, with this project all of them will have a new home in the city centre. The cinema is located in a derelict residential block only 100 meters away from the Zagreb’s main square. The entire project’s program is determined by the gross developed area defined in the master plan and it places the project in the old cinema shell. The new dance centre which will house numerous dancers, choreographers, art troops and companies will have three multipurpose studios (one large studio with 150 telescopic seats and two smaller training studios), three spacious dressing rooms, bathrooms, storages for props and technology and office spaces.
The only new architectural element of the centre is the new entrance lobby, a polyvalent space in the service of communication and meeting with a cafe, library and a video store. It was interpolated on the basis of almost default parameters of the existing neighbouring houses. The volume and its broken also form suggest dance movement and they are a new sign and connection element between the courtyard and the roof terrace. The roof terrace is the final element of the centre and an important part of the project of preservation and restoration of Zagreb last open roof stage. |
|
|
|
|
|
|
|
|
LOCATION |
|
|
|
|
|
|
|
|
|
|
|
Continent |
|
|
|
Nation |
|
|
|
Region |
|
|
|
Town |
|
|
|
Address |
|
|
|
|
|
|
|
|
|
|
MAP |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TYPOLOGY |
|
|
|
|
|
|
|
|
|
|
ARCHITECTURE | Education buildings
Training centres and schools
Buildings for recreational activities
Auditoriums and music centres
Theatres
Operations on existing buildings
Renovation, rehabilitation and restructuring
Reconversion
| |
|
|
|
|
CHRONOLOGY |
|
|
|
|
|
|
|
|
Project |
|
|
|
|
|
2003 - 2008
|
|
Realisation |
|
|
|
|
|
2005 - 2009 |
|
|
|
|
|
CLIENT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DIMENSIONAL DATA |
|
|
|
|
|
|
|
|
Surface |
|
|
|
site sq.m. 1,360 gross floor sq.m. 1,438 footprint sq.m. 760 |
|
Volume |
|
|
|
|
|
|
|
|
STRUCTURES |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
STAFF |
|
|
|
|
|
|
|
|
|
|
|
Design team |
|
Sasa Begovic, Marko Dabrovic, Tatjana Grozdanic Begovic, Silvije Novak, Jasminka Jug, Zorislav Petric, Zeljko Mohorovic, Dijana Vandekar, Marin Mikelic |
|
Structural consultant |
|
UPI-2M Berislav Medic, Hrvoje Mihal |
|
Physical engineering |
|
|
Mechanical engineer |
|
Rena prom Igor Šundov Mario Josipovic |
|
Electrical engineer |
|
Vodotehnika Nenad Sutevski RP studio Radovan Tomsic MR konzalting Renato Majcunic |
|
Hydraulic engineer |
|
|
Consultant |
|
|
Plastic models, rendering, visualization |
|
|
Graphics and signage |
|
|
Art intervention |
|
|
Contractor |
|
I phase TA-GRAD
II phase MESIC COM AVC (scene technology) |
|
|
|
|
|
ANNOTATIONS |
|
|
|
|
|
|
|
|
|
|
I phase project: 2003/2005 construction: 2005
II phase project: 2003/2008 construction: 2008/2009 |
|
|
|
|
|
CREDITS |
|
|
|
|
|
|
|
|
|
|
Photos © Sandro Lendler Text edited by 3LHD Courtesy by 3LHD
|
|
|
|
|
|
|