|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
BUILDING |
|
|
|
|
|
|
|
|
|
|
|
Waste-to-Energy Plant
|
|
|
|
|
|
DESIGNER |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
CONTEXT |
|
|
|
|
|
|
|
|
Relationship with the location |
|
|
|
|
|
|
|
|
|
|
|
DESCRIPTION |
|
|
|
|
|
|
|
|
. |
|
|
|
Located on the mountainous outskirts of Shenzhen the new Shenzhen East Waste-to-Energy Plant will incinerate 5,000 tonnes of waste per day - equalling one third of the waste generated by Shenzhen's 20 million inhabitants every year. The plant will utilize the most advanced technology in waste incineration and power generation, whilst at the same time act as a source of education for the citizens of Shenzhen. The winning design organizes the entire plant, including auxiliary buildings, into one circular building - breaking with the traditional rectangular layout of industrial facilities. By proposing a clear circular form, the footprint of the plant is minimised and it reduces the amount of excavation required to build on the site. Public visitors are invited into the plant through a landscaped park, via an entrance bridge that rises between the stacks to an entrance lobby and visitor centre overlooking the plant machinery. An internal circular path and walkway circle the plant explaining each process, before leading up to a 1.5km panoramic public walkway on the roof overlooking the surrounding landscape and the city of Shenzhen. |
|
|
|
|
|
|
|
|
VIDEO |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
ECO-SUSTAINABILITY |
|
|
|
|
|
|
|
|
|
|
The 66,000m2 roof is designed to be covered by up to 44,000m2 of photovoltaic panels providing the opportunity for the plant to not only provide a cleaner way to deal with the city’s waste but also contribute to the renewable energy provision for the city. The plant is intended to showcase the Waste-to-Energy production as an important technical process that is geared to deal with the issues of growing waste, as well as the issue of finding more environmentally friendly ways of generating electricity. At the same time visitors become informed on the challenge of the growing amounts of waste we produce every day and are also educated on initiatives on how to reduce their own amount of daily waste. |
|
|
|
|
|
|
|
|
LOCATION |
|
|
|
|
|
|
|
|
|
|
|
Continent |
|
|
Asia |
|
Nation |
|
|
China [Zhōngguó/Zhōnghuá] |
|
Province |
|
|
Guangdong |
|
Town |
|
|
Shenzhen |
|
|
|
|
|
|
|
|
MAP |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
TYPOLOGY |
|
|
|
|
|
|
|
|
|
|
ARCHITECTURE | Industrial buildings and plants
Energy production centres
Plants
| |
|
|
|
|
CHRONOLOGY |
|
|
|
|
|
|
|
|
Project |
|
|
|
|
|
2015 - 2016
project winner of competition
|
|
Realisation |
|
|
|
|
|
2016 - 2020 |
|
|
|
|
|
CLIENT |
|
|
|
|
|
|
|
|
|
|
Shenzhen Energy Environmental Engineering Ltd. |
|
|
|
|
|
DIMENSIONAL DATA |
|
|
|
|
|
|
|
|
Surface |
|
|
|
|
|
|
|
|
STRUCTURES |
|
|
|
|
|
|
|
|
|
|
Schlaich Bergerman Partners |
|
|
|
|
|
STAFF |
|
|
|
|
|
|
|
|
|
|
|
Plastic models, rendering, visualization |
|
Beauty & the Bit, Madrid and Ginsun, Shanghai JR Models, Shanghai |
|
|
|
|
|
CREDITS |
|
|
|
|
|
|
|
|
|
|
Render by Beauty & the Bit, Madrid and Ginsun, Shanghai Models by JR Models, Shanghai Drawings © Schmidt Hammer Lassen Architects Text edited by Schmidt Hammer Lassen Architects Courtesy of Schmidt Hammer Lassen Architects
|
|
|
|
|
|
|